HL-02 Solutions

Industrial self-consumption

We cut the power bill of factories, plants and logistics hubs with systems sized to their real load profile. Buy the system outright or pay only for the energy you use through an on-site PPA.

Talk to a specialist −38 % average bill
HL-02

01 What is included

Everything you need, under one contract.

  • 01

    Load-profile study

    12 months of 15-minute data to size without useless surplus.

  • 02

    Roof & carports

    Structural study, lifelines and non-penetrating mounting.

  • 03

    On-site PPA

    Zero capex: pay a fixed price per kWh for 15 years.

  • 04

    Grants & tax credits

    We handle grants, local tax rebates and energy-saving certificates.

  • 05

    Fleet charging

    EV chargers for electric fleets managed against solar output.

  • 06

    Monitoring

    Real-time dashboard showing output, savings and CO₂ avoided.

02 Technical sheet

Industrial self-consumption

Capacity range
100 kWp – 10 MWp
Typical payback
4 – 6 years
Models
Purchase · PPA · Lease
Service life
30 years

04 FAQ

FAQ

01 What happens to the energy I do not use?

It is exported to the grid under net billing, or stored in batteries when the load profile justifies it.

02 Can my roof hold the weight?

A flush-mounted system adds about 12–15 kg/m². We always run a structural study before quoting.

03 How long does installation take?

Between 6 and 16 weeks from signature, permitting included, depending on size.

Shall we talk about your next megawatt?

Tell us what you have — land, a roof, a load profile or an asset portfolio — and we will get back within 48 hours with a first assessment.