HL-01 Solutions
Utility-scale solar
We take every plant from land search to grid connection: permitting, grid access, detailed engineering, procurement and construction. One accountable partner for schedule, cost and guaranteed performance.
01 What is included
Everything you need, under one contract.
- 01
Land origination
GIS screening, landowner agreements and environmental due diligence.
- 02
Grid access
Node applications, grid studies and guarantees with the TSO/DSO.
- 03
Detailed engineering
Single-axis trackers, bifacial modules and DC/AC ratio optimisation.
- 04
EPC construction
Turnkey, fixed price with performance-backed liquidated damages.
- 05
PPAs & financing
Corporate PPA structuring and bank-backed project finance.
- 06
Agrivoltaics
Layouts compatible with grazing, crops and biodiversity corridors.
02 Technical sheet
Utility-scale solar
- Capacity range
- 5 – 300 MWp
- Technology
- Bifacial + 1-axis tracker
- Typical build time
- 9 – 14 months
- Guaranteed availability
- ≥ 99.2%
03 Reference projects
Reference projects
04 FAQ
FAQ
01 How much land does a 50 MWp plant need?
With single-axis trackers, roughly 70–90 hectares depending on slope, shading and required setbacks.
02 Do you acquire projects under development?
Yes. We assess projects with granted or advanced grid access and can join as a partner or buyer.
03 Do you offer a performance guarantee?
All our EPC contracts include a guaranteed Performance Ratio and a 12-month acceptance test.
Shall we talk about your next megawatt?
Tell us what you have — land, a roof, a load profile or an asset portfolio — and we will get back within 48 hours with a first assessment.