HL-01 Solutions

Utility-scale solar

We take every plant from land search to grid connection: permitting, grid access, detailed engineering, procurement and construction. One accountable partner for schedule, cost and guaranteed performance.

Talk to a specialist 1.8 GW developed
HL-01

01 What is included

Everything you need, under one contract.

  • 01

    Land origination

    GIS screening, landowner agreements and environmental due diligence.

  • 02

    Grid access

    Node applications, grid studies and guarantees with the TSO/DSO.

  • 03

    Detailed engineering

    Single-axis trackers, bifacial modules and DC/AC ratio optimisation.

  • 04

    EPC construction

    Turnkey, fixed price with performance-backed liquidated damages.

  • 05

    PPAs & financing

    Corporate PPA structuring and bank-backed project finance.

  • 06

    Agrivoltaics

    Layouts compatible with grazing, crops and biodiversity corridors.

02 Technical sheet

Utility-scale solar

Capacity range
5 – 300 MWp
Technology
Bifacial + 1-axis tracker
Typical build time
9 – 14 months
Guaranteed availability
≥ 99.2%

04 FAQ

FAQ

01 How much land does a 50 MWp plant need?

With single-axis trackers, roughly 70–90 hectares depending on slope, shading and required setbacks.

02 Do you acquire projects under development?

Yes. We assess projects with granted or advanced grid access and can join as a partner or buyer.

03 Do you offer a performance guarantee?

All our EPC contracts include a guaranteed Performance Ratio and a 12-month acceptance test.

Shall we talk about your next megawatt?

Tell us what you have — land, a roof, a load profile or an asset portfolio — and we will get back within 48 hours with a first assessment.