Operating
Los Llanos
150 MWp
38.57° N · 7.91° W
Plant backed by a 12-year corporate PPA with an Iberian supermarket chain.
Alentejo Solar was our first large project outside Spain. 70% of its output is sold at a fixed price to a corporate offtaker, which allowed financing to close in 5 months.
The plant has its own weather stations and a dry-cleaning system that avoids water use in a water-stressed region.
Related projects
Tell us what you have — land, a roof, a load profile or an asset portfolio — and we will get back within 48 hours with a first assessment.