Operating
Alentejo Solar
120 MWp
38.99° N · 1.86° W
Our largest plant to date: 150 MWp with single-axis trackers and bifacial modules.
Los Llanos was built in 13 months on 210 hectares of dryland. The plant combines 272,000 bifacial modules with single-axis trackers that follow the sun east to west, raising output by 21% versus fixed-tilt.
The layout keeps biodiversity corridors and a flock of 600 sheep manages vegetation without herbicides. Construction employed 420 people, 60% of them from the local area.
Related projects
Tell us what you have — land, a roof, a load profile or an asset portfolio — and we will get back within 48 hours with a first assessment.